fawad pervez raja (1)

  • Published on
    18-Feb-2017

  • View
    163

  • Download
    0

Transcript

Fawad Pervez Raja

Fawad Pervez RajaAddress (UAE) Flat no 312 village mall Musaffah Abudhabi.Mobile (Uae) 971-528946587Email: fawad_raja02@hotmail.comVisa Status: Employed (Free Zone) OBJECTIVE:Currently looking to join a dynamic company of motivated and hardworking professionals, The experience regarding to core areas of construction are structures including sub structure and super structure of building and bridges. Design and construction of Roads .Foundations such as pilling,deep excavated piles diaphragm wall, secant wall, grouting etc.

PROFESSIONAL EXPERIENCE:Updated Work Experience 3 years.PROJECT AND DESIGNATIONCOMPANY AND TIME PERIOD DUTIES AND RESPONSIBILITIES

Project engineer in New Abudhabi Airport project(bridge project)

Project engineer in high rise commercial building projectAbu DhabiCorniche near investment center towerBAUER INTERNATIONAL(01-OCT-2014 TO DATE)(Multinational group

BAUER INTERNATIONAL FZE(01-JUL-2014 TO 31 SEP)(Multinational group)>Structure of pile cap, piers, precast girders and foundation(bridge)>Dealing with construction of pilling works 1200 and 1500 mm piles.>Grouting, soil stabilization and anchor installations>Tests related to that e.g. Static Load Test, Dynamic Load Test, Sonic test, Caliber logging test etc.>Managing the sites, preparing plans and schedules

>Dealing with construction of diaphragm wall and deep pilling excavation works>Installation of anchors ,dewatering well units and strut pipe system >Managing resources, preparing plans and schedules.>Effective coordination with contractor and consultant>Dealing with all documents and safety parameters for ensure safe environment at site> cost evaluation,quantities estimation, material checks and resource allocations

Project engineer in Al Warf Bateen Hotel projectBAUER INTERNATIONAL(17-JUNE-2014 TO 31-JUNE-2014)(Multinational group)>Dealing with construction of secant piles>Training phase of health and safety, checks for safe environment including all documents and permits>Dealing with execution of secant pile works>managing the resources

Assistant Director in building project MH Project Rawalpindi(Pak Arab project)DW&CE (DCI)(Defence Complex Islamabad)(06-0ct-2012 to 15-jul-2014)(Multinational company)>Dealing with structures including sub structure and super structure>Dealing with resources and managing them>Dealing with contractor and subcontractors>water proofing and finishes works>plans and schedules>cost evaluation, quantitiesestimation, material checks and resource allocations.>Ensure safe work environment and work procedures

INTERN as Juniorengineer in dunk in donut outlet projectKarachi(finishes and interior deco project)

MIMA CONSTRUCTION(20-JUNE-2012 TO 23-JUL-2012)>Quantity estimates(with senior quantity surveyor)>Dealing with consultants>Fast track schedule>supervising the site>Finishes and interior works

INTERN as Junior engineer in Golrahmorah road project Rawalpindi

NLC(NATIONAL LOGISTIC CELL)(23-MAY-2011 TO 1-JULY-2011)(Multinational group)>construction of roads>drawings and execution>compaction ,asphalt and bitumen tests>quantity estimates>formation of wall and drainage system>software eagle point application>leveling of subgrade,base and wearing course layers

DETAIL RESEARCH WORK AND EXPERIENCE ON HIGHWAY:(01 JAN 2011 TO 01 0CT 2012)

Project: Designing of Rural Highway with the help of AUTOCAD (Civil 3D). Management and Scheduling of rural highway with the help of MS PROJECT. Cost Analysis, resource graphs and time of a project.

TRAININGS AND CERTIFICATION:

CertificationDescrption

ADVETIABU DHABI Occupational Health and Safety Practitioners Course (94%)

IOSHHealth and Safety Course

SafetyGeneral training from Mieldif security and safety consultants

MicrosoftCertified training in computer aided project management with the help of MS PROJECT 2010 (NED UET

AutoCAD 3dTraining for Final year Project (NED UET)

ACADEMIC QUALIFICATIONS:

SessionQualificationCGPAUniversity

2014- ongoingMS Project managementComsats institute information and Technology

2008-2012BE Civil Engineering3/4NED UET Karachi

2006-2007HSSC (pre- Engineering73%F.G Sir Syed College Rawalpindi

2004-2005SSC85%Army Public School Ordnance Road, Rawalpindi

COMPUTER SKILLS: AUTOCAD FORTRAN Geo Media Pro 6.0 Minitab MS Office MS Project (Microsoft Certification) GW Basic HTML

PERSONAL PROFILE:

Date of Birth 31 Jan 1989 CNIC(EMIRATES 784-1989-6480958-0 CNIC (PAK 37405-0278542-9 Address (PAK) H No 209, Street9, Askari 13,and Rawalpindi. Mobile (Pak +92 332 5035137 Driving license Islamabad Skype id rajafawad8

REFERENCES:

Reference will be furnished on demand.

CIVIL ENGINEER Page 1