BSS452BUILDING CONSTRUCTION AND

MATERIALS II

Wan Zuriea Wan Ismail

Centre of Studies for Building Surveying

UNDERPINNING

Page 2: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 2/51

LEARNING OUTCOMES :

1) Students are able to understand the conceptand type of underpinning works

2) Students are able to identify the needs ofunderpinning works

3) Students are able to understand the

construction methods for underpinning works

Page 3: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 3/51

LECTURE CONTENTS :

1.0 Introduction

2.0 Underpinning

3.0 The reasons of underpinning

4.0 By-law requirements

5.0 Methods and inspections

6.0 Methods of underpinning

7.0 Conclusion

Page 4: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 4/51

INTRODUCTION :

Underpinning is the process of strengtheningand stabilizing the foundation of an existingbuilding or other structure.

Permanent construction, which directlytransmits existing structure foundation loads

to a lowest bearing elevation or strata. Underpinning is accomplished by extending

the foundation in depth or in breadth so iteither rests on a stronger soil stratum or

distributes its load across a greater area.

Page 5: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 5/51

UNDERPINNING :

Underpinning is a method of construction that seesthe depth of the foundations to a building beingincreased.

The soil beneath the existing foundation isexcavated and is replaced with foundation material,normally concrete.

Underpinning requires close attention to design,methodology and safety procedures.

The main objective of most underpinning work is to

transfer the load  carried by a foundation from its

existing bearing level  to a new level at a lowerdepth.

 Also can be used to replace an existing weak

foundation.

Page 6: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 6/51

The reasons for Underpinning :

Underpinning may be necessary for a variety ofreasons:

1) The original foundation is simply not strong or stable enough, e.g due to decay of timber piles under the

foundation.

2) The existing foundations of the building havemoved-this is caused by poor soil or changes to thesoil conditions (e.g. subsidence has occurred).

3) The properties of the soil supporting the foundationmay have changed or was mischaracterized duringplanning.

Page 7: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 7/51

The reasons for Underpinning :

Underpinning may be necessary for a variety ofreasons:

4) The usage of the structure has changed ie there hasbeen a decision to add another storey to the

building, either above or below ground level, and thedepth of the existing foundations is inadequate tosupport the modified building or load (weight) of it.

(increase in loading)

5) The construction of nearby structures  necessitatesthe excavation of soil supporting existingfoundations.

Page 8: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 8/51

By Law Requirements :

Underpinning work requires very careful planningand execution. Any proposed to underpin an existingfoundation, approval under the building regulationwill normally be required.

Obtaining approval will usually involve thepreparation of a structural design of theunderpinning, including the process to carried outduring construction

Page 9: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 9/51

General precautions :

Notify adjoining owners of proposed works giving full

details and temporary shoring or tying.

Carry out detailed survey of the site, the building to

be underpinned and of any other adjoining or

adjacent building or structures. A careful record ofany defects  found should be made and where

possible agreed with the adjoining owner(s) before

being lodged in a safe place.

Indicators or ‘tell tales’ should be fixed over existingcracks so that any subsequent movements can be

noted and monitored.

Page 10: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 10/51

General precautions :

If settlement is the reason for the underpinning

works, a thorough study should be carried out to

establish the cause and any necessary remedial

work put in hand before any underpinning works are

started. Before any underpinning work is started, the loads

on the building to be underpinned should be reduced

as much as possible by removing the imposed loads

from the floors and installing any props and/orshoring which is required.

Page 11: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 11/51

General precautions :

 Any services which are in the vicinity of the

proposed underpinning works should be identified,

traced, carefully exposed, supported and protected

as necessary.

Page 12: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 12/51

Method and Inspections :

The exact method to be employed for underpinningwill depend on the many circumstances of the case.

To avoid excessively undermining the existingfoundations, causing further damage to thestructure, the excavations for the underpinningshould be carried out to engineer’s  instructions anddetails.

The excavation for each section of underpinning willnormally be inspected by a design engineer and abuilding control surveyor before it can be carry out.

Page 13: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 13/51

Method and Inspections :

The timing of each stage and the specification of thematerials to be used will vary on a case by basebasis and should normally be subject of a structuralengineer’s design.

Page 14: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 14/51

Methods of Underpinning:

Standard Methods of underpinning:

i. Traditional Underpinning

ii. Needle Beams underpinning

iii. Cantilever Beamsiv. Raft Underpinning

v. Piled Underpinning

vi. Jack pile underpinning

vii. Pynford Stool Underpinning

Page 15: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 15/51

Methods of Underpinning:

1. Traditional Underpinning:

• This method stabilises existing wall foundations bydigging under the present foundation in sequencedbays to a depth where firm strata exists andreplacing the excavated material with massconcrete.

• The loading capabilities are based upon the strataencountered. In some circumstances when theexisting footing is adequate to span between

supports, intermediates piers can be used toreduced cost, i.e missing out piers 2 and 4 as shownon the diagram.

Page 16: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 16/51

Methods of Underpinning:

1. Traditional Underpinning:

To prevent fracture, damage or settlement of the

walls being underpinned the work should always be

carried out in short lengths called legs or bays.

The length of bays will depend upon the following

factors:-

• Total length of wall to be underpinned;

• Wall loading;

• General state of repair and stability of wall and

foundation to be underpinned;

• Nature of subsoil beneath existing foundation;

• Estimated spanning ability of existing foundation.

Page 17: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 17/51

Methods of Underpinning:

1. Traditional Underpinning:

Generally suitable bay length are:-

1.000 to 1.500 for mass concrete strip foundations

supporting walls of moderate loading. 1.500 to 3.000 for reinforced concrete strip

foundations supporting walls of traditional

construction.

In all cases, the total sum of the unsupportedlengths of wall should not exceed 25% of the

total wall length.

Page 18: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 18/51

Methods of Underpinning:

1. Traditional Underpinning:

The sequence of bays should be arranged so

that working in adjoining bays is avoided until

one leg of underpinning has been completed,pinned and cured sufficiently to support the wall

above.

Page 19: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 19/51

Traditional Underpinning :

Page 20: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 20/51

Traditional Underpinning :

Page 21: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 21/51

Traditional Underpinning :

Page 22: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 22/51

Page 23: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 23/51

Traditional Underpinning :

Page 24: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 24/51

Methods of Underpinning:

2. Needle Beams Underpinning:

• This method stabilises wall foundations by the use ofpiles installed either side of an existing wall. A smallpocket is broken out below the ground level and a

reinforced concrete needle beam is cast in-situconnecting the piles and supporting the wall.

• Reducing the span between needle beams canaccommodate very high loads. However, the bearing

capacity of the underlying strata will determine thenumber, diameter and spacing of piles used.

Page 25: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 25/51

Page 26: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 26/51

Page 27: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 27/51

Needle Beams Underpinning

Page 28: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 28/51

Needle Beams Underpinning

Page 29: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 29/51

Needle Beams Underpinning

Page 30: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 30/51

Methods of Underpinning:

3. Cantilever Beams:

• This method stabilises existing wall foundationseither internally or externally whichever the mostappropriate.

• Two mini-piles are installed, one compression andone tension.

•  A pocket is broken out into the existing wall and areinforced concrete beam is cast linking the twopiles.

Page 31: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 31/51

Methods of Underpinning:

3. Cantilever Beams:

• This system is used where traditional underpinningis not appropriate due to the existing foundationsbeing deep that it is uneconomical to dig. (depths

greater than 1.5m). Or needle beams cannot beused due to access constraints.

• Reducing the span between cantilevers canaccommodate high loads. However, the bearing

capacity of the underlying strata will determine thenumber, diameter and spacing of piles used.

Page 32: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 32/51

Methods of Underpinning:

3. Cantilever Beams:

• Piles are installed at approximately 1.0m - 1.5mcentres and 1.2m apart determined by loadings.Then pockets are broken out and reinforced beams

are placed to pick up the walls. Beams are usuallycast alternate.

Page 33: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 33/51

3. Cantilever Beams:

 Advantages of this system are:

• Faster than traditional underpinning

•  Access from one side only• Occupants can stay in the property duringconstruction

• Economical at depths greater than 1.5m

• Suitable for restricted access

• Cantilever beam constructed at a higher level ifexisting foundation too deep

• High load capability

Page 34: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 34/51

Cantilever Beams Underpinning

Page 35: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 35/51

Cantilever Beams Underpinning

Page 36: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 36/51

Methods of Underpinning:

4. Raft Underpinning:

• This method stabilises existing wall foundations towhole rooms or buildings. Mini piles are installedwithin the property and capped with an integral

reinforced concrete raft. Needle beams project fromthe slab into walls below ground level.

• Reducing the span between projecting needlebeams and increasing pile numbers can

accommodate highly loaded structures. However,the bearing capacity of the underlying strata willdetermine the number, diameter and spacing of pilesused.

Page 37: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 37/51

Methods of Underpinning:

4. Raft Underpinning:

• This system is used where whole rooms or wholestructures are to be underpinned and includes theprovision of a new integral floor slab.

• It is appropriate when existing foundations are deep,or that good bearing strata is so deep that it isuneconomical to dig (depths greater than 1.0m)

Page 38: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 38/51

Methods of Underpinning:

4. Raft Underpinning:

• Piles are installed at centers determined byloadings. Pockets are then broken out andreinforced needle beams are placed to pick up the

walls.

•  A ring beam is constructed and linked to needles,mesh is laid and the whole structure poured.

Page 39: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 39/51

Methods of Underpinning:

4. Raft Underpinning:

 Advantages of this system are:

Provides lateral traverse ties throughout thestructure

Provides new floor slab upon completion

Economical at depths greater than 1.5m

No need for external access

Minimise disruption to drainage and services

Page 40: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 40/51

Raft Underpinning

Page 41: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 41/51

Page 42: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 42/51

Methods of Underpinning:

5. Jack pile underpinning This method can be used when the depth of a

suitable bearing capacity subsoil is too deep to

make traditional underpinning uneconomic.

Jack pile underpinning is quiet, vibration free and

flexible since the pile depth can be adjusted to suit

subsoil conditions encountered.

Page 43: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 43/51

Methods of Underpinning:

5. Jack pile underpinning This method can be used when the depth of a

suitable bearing capacity subsoil is too deep to

make traditional underpinning uneconomic.

Jack pile underpinning is quiet, vibration free  andflexible since the pile depth can be adjusted to suit

subsoil conditions encountered.

The existing foundations must be in a good condition 

since they will have to span over the heads of thepile caps which are cast onto the jack pile heads

after the hydraulic jacks have been removed.

Page 44: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 44/51

Jack Pile Underpinning

Page 45: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 45/51

Methods of Underpinning:

6.  Pynford’ Stool Underpinning  This method can be used where the existing

foundations are in a poor condition and it enables

the wall to be underpinned in a continuous run

without the need for needles or shoring. The RC beam formed by this method may well be

adequate to spread the load of the existing wall or it

may be used in conjunction with other forms of

underpinning such as traditional and jack pile.

Page 46: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 46/51

  ynford’ Stool Underpinning 

Page 47: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 47/51

Page 48: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 48/51

Page 49: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 49/51

It could be that one edge of the building was on much softer soil than

the other, so that part of the building settled down a little bit more," Gavin

explained. "That could easily lead to an instability that would precipitate acollapse."

 Another possibility is that weight on the top factory floors—where the

crack was spotted—was unevenly distributed.

 

Page 50: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 50/51

Page 51: Lec 2 - Underpinning

8/17/2019 Lec 2 - Underpinning

http://slidepdf.com/reader/full/lec-2-underpinning 51/51