29
www.snel-rdc.com, [email protected] SEMAINE DE L’INGENIEUR CIVIL CONGOLAIS (Grand Hôtel Kinshasa, 04 - 09 juin 2012) ETAT DES LIEUX DE LA SNEL ET PERSPECTIVES D’AVENIR A L’HORIZON 2025 par Eric MBALA MUSANDA Administrateur Délégué

Presentation AD SNEL (Congo RDC)

  • Upload
    crasus

  • View
    168

  • Download
    22

Embed Size (px)

DESCRIPTION

ETAT DES LIEUX DE LA SNEL ET PERSPECTIVES D’AVENIR A L’HORIZON 2025SEMAINE DE L’INGENIEUR CIVIL CONGOLAIS(Grand Hôtel Kinshasa, 04 - 09 juin 2012)

Citation preview

Page 1: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

SEMAINE DE L’INGENIEUR CIVIL CONGOLAIS(Grand Hôtel Kinshasa, 04 - 09 juin 2012)

ETAT DES LIEUX DE LA SNEL ET PERSPECTIVES D’AVENIR A

L’HORIZON 2025

par

Eric MBALA MUSANDAAdministrateur Délégué

Page 2: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

S O M M A I R E

1.1. Historique1.2. Statut1.3. Structure organique1.4. Tableau de bord de 2005 à 2011

I. PROFIL DE SNEL

II. ETAT DES LIEUX

III. PERSPECTIVES D’AVENIR

2.1. Centrales électriques2.2. Lignes de transport2.3. Réseaux de distribution2.4. Commercial2.5. Systèmes électriques

3.1. Secteur de l’ électricité3.2. Perspectives d’avenir3.3. Carte électrique de la RDC3.4. Coûts des projetsIV. CONCLUSION

Page 3: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

I. PROFIL DE SNEL

1.1. HISTORIQUE

SNEL

INGA I

EauElectricité

REGIDESO

SNEL sarl

Déci

sion d

u

Gouvern

em

ent

SOGEFOR

SOGELEC

COGELIN

19

78

FORCES DU BAS-

CONGO

FORCES DE L’EST

COMECTRIC

19

72

2010

Page 4: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

I. PROFIL DE SNEL

Etablissement de droit public a caractère industriel et commercial

Création le 16 mai 2012 (ordonnance n° 073/033)

Mandat : produire, transporter, distribuer et commercialiser l’énergie électrique

07 juillet 2008 : transformation des entreprises publiques (dispositions générales fixées par la loi n° 08/007)

24 avril 2009 : SNEL devenu société commerciale (décret n° 09/11)

1.2. STATUT

Page 5: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

1.3. STRUCTURE ORGANIQUEConseil

d’Administration

Administrateur DéléguéDélégué Général Adjoint

Cabinet AD

SecrétariatGénéral

Dpt du ContrôleGénéral

Dpt Etudes, Plan.,Normes et Stand.

Dpt de l’Organ.et Systèmes Info.

Dir. Equipementet Electr. Rurale

Dptde Production

Dptde Transport

DptCommercial

Dptdes Finances

Dpt Distributionen Provinces

Dpt Distributionde Kinshasa

Dpt des Appro.et Marchés

Dpt des Res.Humaines

I. PROFIL DE SNEL

Page 6: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

1.4. TABLEAU DE BORD DE 2005 A 2011

Désignation 2005 2006 2007 2008 2009 2010 2011

Puissance installée (MW) Hydroélectrique Thermique Total

2.44218

2.425

2.44218

2.425

2.44218

2.425

2.44218

2.425

2.44218

2.425

2.44218

161.451

2.44218

440.235

Production brute (GWh) 7.171 7.229 7.582 7.246 7.641 7.409 7.189

Ventes (GWh) 5.742 5.697 6.131 5.837 6.323 6.697 6.805

Energie (GWh) Export Import

1.76871,4

1.32363,6

1.50178,5

91582,8

88737,9

916 192

Chiffre d’affaires (10³ USD) 174.850180.40

8240.594 280.773 287.239 310.632 310.591

Nombre d’abonnes factures 433.947422.25

4417.965 428.297 426.232 440.477 483.919

Effectifs 6.142 6.171 6.255 6.173 7.119 7.183 7.232

I. PROFIL DE SNEL

Page 7: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

1.4. TABLEAU DE BORD DE 2005 A 2011 (suite)

I. PROFIL DE SNEL

Evolution du chiffre d’affaires, production brute et nombre d’abonnés

-

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

900,000

CA (USD)

Prod to-tale (x 10 MWh)

Nb abonnés

Page 8: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

II. ETAT DES LIEUX

Inga I

Inga II

2.1. CENTRALES ELECTRIQUES

DésignationMise en service

Nbre de Groupes P (MW)

1. Centrales hydroélectr.

1.1. Réseau Ouest - Inga I - Inga II - Zongo - Sanga - Mpozo

19721981-19821955; 19651932-1949

1934

68562

351,001.424,00

75,0011,522,20

1.2. Réseau Sud - Nseke - Nzilo - Mwadingusha - Koni

1956-19571953-19541929; 1954

1950

4463

248,00108,00

68,0442,12

1.3 Réseau Est - Ruzizi I 1958; 1972 4 28,20

Page 9: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

Désignation Mise en service

Nbre de Groupes P (MW)

1. Centrales hydroélectriques

1.4. Réseau isoles - Tshopo - Lungudi - Mobayi - Kyimbi

1959-1974194919871954

3232

18,801,56

11,4017,20

Total hydroélectr. 58 2.407,44

2. Centrales thermiques

Total thermique 57 30,60

TOTAL HYRDO + THERM 2.438,04

2.1. CENTRALES ELECTRIQUES (suite)

II. ETAT DES LIEUX

Page 10: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

II. ETAT DES LIEUX

CONTRAINTES

• Absence de révision des machines malgré le dépassement du nombre d’heures de marche requises

• Erreurs de conception et de mise en œuvre des équipements (Inga 2A)

• Arrêt de près de 50% des groupes du parc de production suite à la vétusté et au manque de maintenance

• Ensablement du canal d’amenée (dans les centrales) du fait du manque de dragage, ce qui réduit la production disponible

Page 11: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

II. ETAT DES LIEUX

CONTRAINTES (suite)

• Difficulté d’approvisionnement en pièces de rechange et produits pétroliers pour les centrales thermiques

• Coût d’exploitation élevé des centrales thermiques, d’où négociation entre partenaires (SNEL, gros consommateurs et Etat) du tarif à appliquer

• Contrainte climatique se traduisant par la baisse du débit des cours d’eau, principalement dans le Katanga et le Sud Kivu, avec un impact sur la production

• Etc.

Page 12: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

2.2. LIGNES DE TRANSPORT

II. ETAT DES LIEUX

RESEAUNIVEAU TENSION (kV)

500 220 132 120 70 50 TOTAL

OUEST - 650,6 185,3 - 244,5 - 1.080,4

SUD - 735 - 1.203,7 - 128,8 2.067,5

EST - - - - 260 - 260

INGA - KOLWEZI 1.774 - - - - - 1.774

TOTAL 1.774 1.385,6 185.3 1.203,7 504,5 128,8 5.181,9

Longueur des lignes (km)

Transformateurs par réseau

RESEAU Nbre de Postes

Nbre detransfos

Puiss. Inst. (MW)

Tension (kV)

OUEST 20 26 1.165,16 220 – 132 – 70

SUD 13 20 608 220 – 120 – 50

EST 4 8 46,2 110 – 70

TOTAL 37 54 1.819,36

Page 13: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

CONTRAINTES

II. ETAT DES LIEUX

• actes de vandalismes: vols intempestifs des cornières des lignes HT de transport et des conducteurs surtout dans le réseau Sud;

• saturation des lignes notamment la ligne 220 kV Inga-Kinshasa;

• surcharge de certains postes HT utilisés à plus de 100% de leur capacité suite à l’accroissement de la demande;

• etc.

Page 14: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

2.3. RESEAUX DE DISTRIBUTION

Nombre de postes MT/MT

Longueur des réseaux MT

Nombre de cabines MT/BT

Longueur des réseaux BT

: 49

: 4.470 km

: 2.866

: 17.433 km

CONTRAINTES

II. ETAT DES LIEUX

• vétusté des installations et équipements;

• surcharge des transformateurs dans les cabines de distribution et des canalisations MT et BT;

• aménagement des routes ayant conduit à la destruction des câbles;

Page 15: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

CONTRAINTES

II. ETAT DES LIEUX

• présence au sol des conducteurs dénudés sur le réseau cause d’électrocution de la population ;

• actes de vandalisme: vols des conducteurs et d’huile des transformateurs;

• application de l’alimentation rotative des clients suite à l’insuffisance de l’offre

• etc.

Page 16: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

II. ETAT DES LIEUX

2.4. COMMERCIAL

16

• Nombre d’abonnés enregistré

dans la base des donné

– Export : 10

– HT : 30

– MT : 1 669

– BT : 689 214

• Nombre des CVS : 58

• Faible taux de desserte + 9%.

2007 2008 2009 2010 2011 2012 -

100

200

300

400

500

600

* BT * Autres MT

IllustrationSEGMENTATION DE LA

CONSOMMATION EN MWH DU KATANGA

• tarifs moins rémunérateurs fixés par l’Etat • tarifs préférentiels appliqués à certains gros consommateurs;• difficulté de recouvrer ses créances auprès des instances officielles, des sociétés étatiques et paraétatiques• etc.

CONTRAINTES

43%

19%

38%

BT MT

STRUCTURE DES VENTES INTERIEURES EN 2011

Des chiffres

Page 17: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

2.4. COMMERCIAL

II. ETAT DES LIEUX

ITEM

SOCIETE TARIF MOYEN

USD/kWh

NOUVELLE CONNECTI

ON

1 BPC 7

2 EDM 7,5 163 000

3 ENE 6

4 ESCOM 6,8 14 487

5 ESKOM 8,7

6 LEC 5,9 21 079

7 NamPower 8,6

8 SEC 11,5

9 SNEL 4,8 103 878

10 TANESCO 8,2

11 ZESA 9,8

12 ZESCO 5,7 55 699

TARIF DANS LA SOUS-REGION SADC

Page 18: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

2.5. SYSTEMES ELECTRIQUES

MatadiMoanda

Lukula

Tshela

Inga

SangaKikwit

Masi-

Kenge Mweka

Tshikapa

Kananga

Lungudi

TshalaLubilanji

Kabinda

Kaniama

Mbanza-Kongolo

Kabalo

Kasongo

Kalemie

Kindu

Goma

Bukavu

Kisangani

Bandundu

BulunguIlebo

Tembo

Idiofa

InongoInongo

MbandakaBoende

Basankusu

Lisala Bumba

GbadoliteLibenge

Zongo

Gemena

Mobayi

Buta

Kyimbi

Kamina

Beni

Butembo

Kilubi

KolweziLikasi

Lubumbashi

Boma

NsekeNzilo

KoniM´sha

Piana Mwanga

Lepudungu

Nepoko

Mugombe

KakobolaKitona

Katende

Gungu

Kinshasa

Kamimbi

Ruzizi

Yangambi

Isiro

Kisalala

Rutshuru

Semliki

manimba

Bamba

Feshi

Kahemba

Kasongo-

PopokabakaNgunguKimvula

Seke-Banza

Lunda

Zongo

Bagata

MushieKutu

Inongo

Kiri

Oshwe

Mbuji Mayi

DembaDimbelenge

LusamboLubefu

Lodja

Kole

Katako-Kombe

Luebo

Dekese

Kazumba

Mwene-Ditu

Luiza

Lubao

Sakania

Kipushi

Tshopo

Mpozo

Mitwaba

ManonoMoba

Bukama

Malemba-Nkulu

Kasenga

NyunzuMani

Kabongo

Dilolo

Sandoa

Kapanga

Luozi

Kasanza

IngendeBikoro

Ruki

BefaleBolomba

Bongandanga

Bomongo

BudjalaKungu

Bosobolo

Businga

Monkoto

Bokungu

Ikela

Djolu

Bumba Aketi

DingilaBambesa

AngoBondo

Poko

Niangara

RunguM’zoro

Faradje

Mahagi

AruWatsa

Wamba

Bafwasende

BanaliaBasokoBengamisa

Isangi

YahumaBabeba

WageniaWanie-Rukula

UbunduOpala

MambasaIrumu

Budana

BuniaSoleniama

Djugu

Kibombo

Fizi

MangembeKampene

PangiUvira

MwengaMungombe

WalunguShabunda

MogaShabunda

LulinguKabare

Kalehe

Lignes de transport 220 kV existantes

Lignes en projet

Ligne THTCC Inga - Kolwezi

Centrales Hydro existantes

Centrales Hydro en projet

Lignes de transport 110 -132 kV existantes

Centrales thermiques existantes

Légende

100 2000 300 400 500

Kilometers

Equateur

Page 19: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

2.5. SYSTEMES ELECTRIQUES (suite)

Réseaux interconnectés

Réseaux hydroél. isolés : Gbadolite, Kalemie, Kamina, Kindu

Réseaux thermiques : Mbuji-Mayi, Kananga, KikwitMbandaka, Moanda, etc.

‐ Réseau Ouest: Bas-Congo, Kinshasa, Bandundu et interconnexion avec Brazzaville

‐ Réseau Sud: Katanga et interconnexion avec la Zambie (SAPP)

‐ Réseau Est: Bukavu, Goma, Uvira et interconnexion avec Burundi et Rwanda

‐ Liaison THTCC Inga - Kolwezi entre réseaux Ouest et Sud

Page 20: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

• Secteur ouvert aux privés (EDC), SNEL n’est plus seul opérateur.• Les textes sur la réforme du secteur et le code de l’électricité

discutés au parlement attendent leur promulgation.

III. PERSPECTIVES D’AVENIR

3.1. SECTEUR DE L’ELECTRICITE

3.2. PERSPECTIVES D’AVENIR

A court terme Alimentation sélective des abonnés Exigence de récupération de puissance ou d’apport en génération en contrepartie de la signature de nouveaux contrats avec les sociétés minières

Page 21: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

A court terme Sensibilisation à l’efficacité énergétique

avec appui de l’Etat + partenaires publics et privés utilisation des lampes CFL pouvant procurer; de 2012 à 2025, des gains respectifs de 65 à 187 MW au réseau Ouest) et de 12 à 73 MW au réseau Sud éclairage public par lampes solaires (250 W/luminaire) recours aux lampes à faible consommation pour tout nouveau projet généralisation des compteurs à prépaiement

III. PERSPECTIVES D’AVENIR

Page 22: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

A MOYEN ET LONG TERME

Réhabilitation et récupération de puissance du parc de production d’Inga (cofinancement BM, BAD et KFW) :

Programme FRIPT :

Programme PMEDE (BM)

- réhabilitation de 2 groupes d’Inga 2 (356 MW)- à terme : (1775 MW) totalité de la puissance installée

Actions en cours

III. PERSPECTIVES D’AVENIR

Page 23: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

Actions en cours (suite)

Construction des centrales de : - Zongo 2 (150 MW) par Sinohydro - Busanga (240 MW) par Sicomines sur financement de la Chine

Réhabilitation des groupes de Nseke (partenariat TFM)

Programme SAPMP : - réhabilitation du système de transport d’Inga à Kasumbalesa - renforcement du transit Inga - Kolwezi de 560 MW à 1.120 MW impliquant, notamment, la réparation des compensateurs synchrones (financements BM et KCC)

III. PERSPECTIVES D’AVENIR

Page 24: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

A moyen et long terme

Item

Autres projets

1 Centrale hydroél. de Wanie Rukula (688 MW) et lignes 400 kV associées (Wanie Rukula-Kisangani-Buta-Bumba, Wanie Rukula-Bafwasende-Mambasa-Bunia et Bafwasende-Isiro, Wanie Rukula-Walikale-Goma)

2 Centrales hydroél. de Mugomba (40 MW) et Semliki et réseaux associés

3 Réhabilitation/extension des centrales hydroél. de Kyimbi (17 à 43 MW) et Mobayi (11 à 28 MW) et réseaux associés

4 Ligne 400 kV Kinshasa-Kenge-Masimanimba-Bulungu-Kikwit et réseaux associés

5 Ligne 220 kV Goma-Butembo-Beni et réseaux associés

III. PERSPECTIVES D’AVENIR

Page 25: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

Item

Autres projets

6 Ligne 220 kV Bandundu-Nioki-Bikoro-Mbandaka et réseaux associés

7 Ligne 220 kV Bandundu-Bagata-Bulungu et réseaux associés

8 Ligne 220 kV Katende-Kananga-Mbuji Mayi et réseaux associés

9 Centrales hydroél. sur la rivière Luapula (1.100 MW) et réseaux associés

A moyen et long terme

III. PERSPECTIVES D’AVENIR

Page 26: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

100 2000 300 400 500

Kilomètres

MatadiMoanda

Lukula

Kenge

Tshikapa

Lungudi

Kaniama

Kabalo

Kasongo

Kalemie

Ilebo

Tembo

Inongo

Basankusu

Libenge

Kyimbi

Beni

Kilubi Piana Mwanga

Kimvula

Mushie

Luiza

Manono

Mani

Luozi

Budana

KibomboMangembe

Kalehe

Ruzizi II-III (EGL)

Moba

Mpozo

Bengamisa

Lepudungu

Kasanza

Kakobola

Kisalala

DingilaDungu

LulinguMoga

Lutunguru

Butuhe

Kiliba

Kinshasa

Lubilanji I-II

Tshala

Kibula

Kasumbalesa

Lubumbashi

Zulu-

Gd Inga

Karawa

Tembo

Lukenie

Kampene

Sandoa

Bafwasende

Lubero

Semliki

Nepoko

Ditu

Luba

PwetoKapanga

Bagata

Katana

Ubundu

Boende

Zongo

Bumba

Irumu

Lubao

Kamimbi

Mwadingusha

Koni

Inga I-II

Boma

KisanganiWanie-Rukula

BukavuAmbwe

Katakokombe

Shakahamba

Likasi

Moba

Fizi

NyunzuKabinda

Lusambo

Lodja

GandajikaMwene-Kasongo-Lunda

Feshi

Kindu

KalimaLutshurukuru I-II

Lubutu

Walikale

Isiro

MambasaBanalia

Buta

BusingaGemena

Lisala

Musoshi

Luena

Kalule

Fungurume

Kisenge

Bandundu

GunguBambaKitona

Popokabaka

Kahemba

Bulungu

Kikwit

manimbaMasi-

MwekaSeke-Sanga Kongolo

Tshilomba

MungombeUvira

Tshopo

Nyabiondo RutshuruMugomba Kilima

RuangubaKatale

Bunia

Mobayi

Mbandaka

Mbuji Mayi

Kolwezi Tenke

Idiofa

Piopio

L E G E N D E

Centrale hydroélectrique privée

Centrale thermique

Site hydroélectrique inventorié

Ligne HT primaire

Ligne HT ou MT

Poste HT

Poste HT ca

Ligne HT secondaire

Existant

Poste de manœuvre

Poste de conversion

En projet

Centrale hydroélectrique SNEL

En construction

Centrale hydroélectrique

Kabare

Kasenga

Kipushi

LubudiDikolongo

Nseke

Nzilo

Kambove

Mokambo

Sakania

Mitwaba

MitwabaMalemba-Nkulu

Bukama

Kamina

Luebo

Lubefu

Kabongo

Dimbelenge

Dilolo

Kazumba

Katende

Oshwe

Dekese

Kole

Pangi

Kananga

Demba

Tshela

NgunguMbanza-

Banza

ZongoZongo II

Monkoto

Kutu

Lomela

IkelaBikoro

Kiri

Ingende Bokungu

Nioki

Opala

Belia

PuniaMasisi

Shabunda

BefaleBolomba

Djolu

BongandangaYahuma

BomongoBasoko

Isangi

Bambesa

KunguBudjala

AketiPoko

Wamba

Rungu

Bondo AngoBosobolo

GbadoliteM’zoro

Faradje

WatsaAru

Mahagi

Niangara

Soleniama I-IIDjugu

MwengaWalungu

Gombo

Goma

Ruzizi I

Butembo

3.3. CARTE ELECTRIQUE DE LA RDC

III. PERSPECTIVES D’AVENIR

Page 27: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

3.4. Coût des projets

Item Projet (*)Coût(USD)

Délai deréalisatio

n

1 Centrale hydroélectrique du Grand Inga, phase A (3.968 MW) et réseaux associés

7.313.818.000

8,5 ans

2 Centrale hydroélectrique de Nzilo 2(120 MW) et réseaux associés

360.000 4 ans

3 Ligne THT Inga - Fungurume (capacité de 1.500 MW)

1.018.105.000

6 ans

4 Centrale thermique à gaz naturel de Moanda (450 MW)

600.000.000 2 ans

5 Centrale thermique à charbon de Luena (300 MW) et réseaux associés

400.000.000 2 ans

6 Projets d’efficacité énergétique 50.940.000 permanent

Total 9.383.223.000

(*) Financement à rechercher

III. PERSPECTIVES D’AVENIR

Page 28: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]

IV. CONCLUSION

Constat de déficit énergétique lié :

Nécessité d’une action rapide pour résorber le déficit Projets identifiés dont certains en cours d’exécution Recherche de financement à entreprendre pour les projets dépourvus de financement

Solutions rapides :

au boom minier à l’explosion démographique au délabrement des installations électriques

Importation d’énergie (Congo et Zambie) Centrale thermique à gaz de Moanda Centrale thermique à charbon de Luena

Promotion de l’efficacité énergétique Campagne anti gaspillage d’énergie

Page 29: Presentation AD SNEL (Congo RDC)

www.snel-rdc.com, [email protected]